Life Sciences Facilities

Space Conversions

Life Sciences Facilities

Space Conversions

Space Conversions

What makes Space Conversions

A space conversion turns office, warehouse or shell space into laboratory use, governed less by ambition than by what the existing building can actually carry. 

Design considerations for Space Conversions

Structural and floor-loading assessment for benching, heavy instruments and plant; plant capacity, riser space, incoming power and drainage, and whether floor-to-ceiling height allows the services a laboratory needs; condition and risk survey of existing services, plus a refurbishment and demolition asbestos survey; planning and landlord constraints, including external plant, acoustics and reinstatement obligations; fire strategy, means of escape and compartmentation reassessed for the new use; the sustainability case for reuse; and phasing where the building, or other tenants, remain in occupation. 

Regulatory context

Governed by the accreditation the finished laboratory needs to hold, assessed against the building’s surveyed condition rather than assumed capacity. 

How Axentia delivers Space Conversion projects

Conversions carry the most unknowns, structure, floor loading, existing services, plant capacity, asbestos, landlord and planning constraints, so the model follows the survey. Where the building needs structural or plant intervention, Construction Management gives open-book pricing on each package and the flexibility to respond to what the survey uncovers. A straightforward fit-out of a building that already has the capacity, under £500,000, can be delivered with Axentia as Principal Contractor. Either way, we start with a feasibility study, so the conversion is priced against surveyed facts rather than assumptions. 

Case Studies

Examples of Space Conversion projects we've delivered

Space Conversions FAQs

Converting office, warehouse or shell space to laboratory use is governed by what the existing building can carry:

  • Structural and floor-loading assessment for benching, heavy instruments and plant.
  • Plant capacity, riser space, incoming power and drainage, and whether floor-to-ceiling height allows the services a laboratory needs.
  • Condition and risk survey of existing services, plus a refurbishment and demolition asbestos survey.
  • Planning and landlord constraints, including external plant, acoustics and reinstatement obligations.
  • Fire strategy, means of escape and compartmentation reassessed for the new use.
  • The sustainability case for reuse, which is often a material part of the business case.
  • Phasing where the building is occupied, including other tenants.

Conversions carry the most unknowns (structure, floor loading, existing services, plant capacity, asbestos, landlord and planning constraints), so the model follows the survey. Where the building needs structural or plant intervention, Construction Management gives you open-book pricing on each package and the flexibility to respond to what the survey uncovers. A straightforward fit-out of a building that already has the capacity, under £500,000, can be delivered with Axentia as Principal Contractor. Either way we start with a feasibility study, so the conversion is priced against surveyed facts rather than assumptions.

Talk to us about your Space Conversion project

Talk to our team about your facility, budget and timeline — we’ll recommend the right route to delivery.

Privacy Overview

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.