What makes a Clinic Refurbishment project

Refurbishment is governed by the fact that the clinic is still operating, the programme has to work around a live service rather than an empty building.

Design considerations for Clinic Refurbishment projects

Live-environment working, with out-of-hours and phased programmes agreed around clinical sessions; dust, noise, infection control and access management while patients are on site; survey of existing services, plus asbestos and condition risk, before any programme is committed; bringing an older clinic up to current standards for accessibility, fire safety, ventilation and infection control; temporary provision or decant space so the service can continue; and a realistic allowance for what the survey cannot see until work opens the building up. 

Regulatory context

Current accessibility, fire safety, ventilation and infection-control standards, brought up to date as part of the works. 

How Axentia delivers Clinic Refurbishment projects

Refurbishments carry unknowns and have to be worked around a live service, so Construction Management is usually the safer route: Axentia holds the trade packages, sequences them around your sessions and prices variations without an external contractor margin. A single-room or single-phase refurbishment under £500,000 can be delivered with Axentia as Principal Contractor.

Case Studies

Examples of Clinic Refurbishment projects we've delivered

Clinic Refurbishments FAQs

Refurbishment is governed by the fact that the clinic is still operating:

  • Live-environment working, with out-of-hours and phased programmes agreed around clinical sessions.
  • Dust, noise, infection control and access management while patients are on site.
  • Survey of existing services, plus asbestos and condition risk, before any programme is committed.
  • Bringing an older clinic up to current standards for accessibility, fire safety, ventilation and infection control.
  • Temporary provision or decant space so the service can continue.
  • A realistic allowance for what the survey cannot see until work opens the building up.

Refurbishments carry unknowns and have to be worked around a live service, so Construction Management is usually the safer route: we hold the trade packages, sequence them around your sessions and price variations without an external contractor margin. A single-room or single-phase refurbishment under £500,000 can be delivered with Axentia as Principal Contractor.

Talk to us about your Clinic Refurbishment project

Talk to our team about your facility, budget and timeline — we’ll recommend the right route to delivery.

Privacy Overview

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.