Life Sciences Facilities

Diagnostic & Pathology Laboratories

Life Sciences Facilities

Diagnostic & Pathology Laboratories

Diagnostic & Pathology Laboratories

What makes Diagnostic & Pathology Laboratories

A diagnostic or pathology laboratory processes samples at volume and reports results against an accreditation the operator has to hold, so it is designed around throughput as much as science.

Design considerations for Diagnostic & Pathology Laboratory projects

Sample flow planned end to end, from reception and registration through analysis to reporting and storage, with no crossover between clean and used material; analyser layout and servicing access set by the instrument platform, including heat load, uninterruptible power and water treatment; temperature, humidity and air-change stability sufficient for reliable analytical performance; service continuity where an existing laboratory is being replaced, including a phased transfer plan for equipment and staff; LIMS and IT infrastructure, sample tracking and data integrity provision; and specimen and reagent cold storage, with a compliant route for clinical and chemical waste. 

Regulatory context

ISO 15189 accreditation route and validation of methods designed in from the start, not retro-fitted. 

How Axentia delivers Diagnostic & Pathology Laboratory projects

Diagnostic laboratories are defined by throughput and by the ISO 15189 accreditation route, and most of them replace a service that has to keep running. Construction Management suits them best: holding the packages ourselves lets us sequence works around service continuity and bring analyser suppliers, validation of methods and accreditation activity into one programme. Where the scheme is a smaller extension or a single-discipline fit-out under £500,000, Axentia as Principal Contractor is the simpler route. 

Case Studies

Examples of Diagnostic & Pathology Laboratory projects we've delivered

Diagnostic & Pathology
Laboratories FAQs

A diagnostic laboratory is designed around throughput and around the accreditation it has to hold:

  • Sample flow planned end to end, from reception and registration through analysis to reporting and storage, with no crossover between clean and used material.
  • Analyser layout and servicing access set by the instrument platform, including heat load, uninterruptible power and water treatment.
  • ISO 15189 accreditation route and validation of methods designed in from the start, not retro-fitted.
  • Temperature, humidity and air change stability sufficient for reliable analytical performance.
  • Service continuity where an existing laboratory is being replaced, including a phased transfer plan for equipment and staff.
  • LIMS and IT infrastructure, sample tracking and data integrity provision.
  • Specimen and reagent cold storage, and a compliant route for clinical and chemical waste.

Diagnostic laboratories are defined by throughput and by the ISO 15189 accreditation route, and most of them replace a service that has to keep running. Construction Management suits them best: holding the packages ourselves lets us sequence works around service continuity and bring analyser suppliers, validation of methods and accreditation activity into one programme. Where the scheme is a smaller extension or a single-discipline fit-out under £500,000, Axentia as Principal Contractor is the simpler route.

Talk to us about your Diagnostic & Pathology Laboratory project

Talk to our team about your facility, budget and timeline — we’ll recommend the right route to delivery.

Privacy Overview

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.