Life Sciences Facilities

Lab Support & Write-up Spaces

Life Sciences Facilities

Lab Support & Write-up Spaces

Lab Support & Write-up Spaces

What makes Lab Support & Write-up Spaces

Support space is what makes the laboratory itself work efficiently, the write-up, welfare, storage and preparation areas around the working benches, usually under-provided in a standard fit-out. 

Design considerations for Lab Support & Write-up Spaces

Write-up, meeting and welfare space adjacent to the laboratory but outside the working environment; cold rooms, media preparation, wash-up and autoclave provision, with the services and ventilation each needs; bulk and consumable storage, including flammables and chemical storage to the relevant standards; clear separation of clean, contained and office environments, with a considered transition between them; goods-in, decanting and waste holding areas and the routes between them; and acoustic and thermal separation so instrument and plant noise does not carry into write-up space. 

Regulatory context

Chemical and flammables storage standards, and the separation requirements that follow from the adjacent laboratory’s own accreditation. 

How Axentia delivers Lab Support & Write-up Space projects

The delivery model depends on scale. If your project is smaller, either because the base facility already exists or the scale is modest, we may be able to take it on as Principal Contractor. If the space is being built from scratch, or forms part of a larger laboratory build, Construction Management is usually the better fit. 

Case Studies

Examples of Lab Support & Write-up Space projects we've delivered

Lab Support & Write-up Spaces FAQs

Support space is what makes the laboratory itself work efficiently, and it is usually under-provided:

  • Write-up, meeting and welfare space adjacent to the laboratory but outside the working environment.
  • Cold rooms, media preparation, wash-up and autoclave provision, with the services and ventilation each needs.
  • Bulk and consumable storage, including flammables and chemical storage to the relevant standards.
  • Clear separation of clean, contained and office environments, with a considered transition between them.
  • Goods-in, decanting and waste holding areas, and the routes between them.
  • Acoustic and thermal separation so instrument and plant noise does not carry into write-up space.

The delivery model depends on a few factors. If your project is smaller, either because the base facility already exists or the scale is modest, we may be able to take it on as Principal Contractor, which has several benefits set out on our services pages. However, if the space is to be built from scratch, or forms part of a larger laboratory build, you may be better suited to our Construction Management model.

Talk to us about your Lab Support or Write-up Space project

Talk to our team about your facility, budget and timeline — we’ll recommend the right route to delivery.

Privacy Overview

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.